docs(coordination): cycle-2 CLI tail kickoff prompts (PM + Dev A/B/C)
Partitions Plan B's remaining phases (3-8) across three cycle-2 streams once cycle-1 Stream A and Stream B's bundled Phase 1+2 PR have merged. Stream A picks up Phase 3 (prompt_or_flag + builder compression), Stream B owns Phases 4/5/6 (after_manifest_change, ParamsFile, batched purge), Stream C owns Phases 7/8 (parser migration to relicario-core + WASM exports). Plan C (extension restructure) is not in cycle 2. Each kickoff bakes in cycle-1 lessons: prefer single-line relay body content, avoid the f-string footgun in Python inbox-monitor scripts, narration discipline (IN-PROGRESS updates at meaningful in-flight moments, not just phase boundaries). The PM prompt also captures cycle-1 outcomes (commits/PRs landed, the 17 pre-existing extension test failures pattern, DEV-B's option-(b) git_run choice) so the new PM picks up cold without relay history. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
@@ -0,0 +1,64 @@
|
|||||||
|
# CLI Tail — Cycle 2 Coordinator
|
||||||
|
|
||||||
|
**Date:** 2026-05-09
|
||||||
|
**Status:** Draft (launches once cycle-1 prerequisites land)
|
||||||
|
**Theme:** parallelize the post-split tail of Plan B (the CLI restructure) across three independent streams. Plan B's eight phases are already defined in `docs/superpowers/specs/2026-05-04-cli-restructure-design.md`; this coordinator only partitions the remaining phases across cycle-2 streams and records the cross-stream contracts.
|
||||||
|
|
||||||
|
## What this is
|
||||||
|
|
||||||
|
The cycle-1 four-agent run (`2026-05-04-arch-followup-*`) ships:
|
||||||
|
|
||||||
|
- **Stream A** — Plan A (security + docs polish): `impl Drop for SessionHandle`, JS swallow removal, `recovery_qr.rs` docs, `start.sh` fourth-window. Independent of B and C.
|
||||||
|
- **Stream B** — Plan B Phases 1 + 2 only (mechanical `main.rs` split + `helpers::git_run` + 16-site sweep). Stops after Phase 2 per a 2026-05-09 user-driven RESCOPE directive.
|
||||||
|
- **Stream C** — Plan C (extension restructure). Did not launch in cycle 1 (DEV-C never acked); remains pending and is *not* picked up by cycle 2 (still its own multi-week effort, separate kickoff).
|
||||||
|
|
||||||
|
The remaining six Plan B phases (3 through 8) are partitioned across three cycle-2 streams below. Each cycle-2 stream is independent of the other two once cycle-1 Stream B (Phase 1 + 2) has merged to `main`.
|
||||||
|
|
||||||
|
## Pre-launch checklist (cycle 2 cannot open until all green)
|
||||||
|
|
||||||
|
- [ ] Cycle-1 Stream A merged to `main`
|
||||||
|
- [ ] Cycle-1 Stream B PR (Phase 1 + 2 bundle) merged to `main`
|
||||||
|
- [ ] Working tree clean on `main`; `git pull` reflects both merges
|
||||||
|
- [ ] All cycle-1 worktrees torn down (`git worktree remove ../relicario.arch-followup-stream-a` and `*-stream-b`); cycle-1 branches deleted locally if requested
|
||||||
|
- [ ] Relay server still running on `localhost:7331` (check `ss -ltn 'sport = :7331'`)
|
||||||
|
- [ ] Cycle-2 kickoff prompts present in `docs/superpowers/coordination/2026-05-09-cli-tail-{pm,dev-a,dev-b,dev-c}-prompt.md`
|
||||||
|
|
||||||
|
## Stream partition
|
||||||
|
|
||||||
|
| Stream | Branch | Worktree | Plan B phases | Theme |
|
||||||
|
|---|---|---|---|---|
|
||||||
|
| A | `feature/cli-tail-stream-a-prompt-helpers` | `/home/alee/Sources/relicario.cli-tail-stream-a` | Phase 3 | `prompt_or_flag<T>` + `build_*_item` compression |
|
||||||
|
| B | `feature/cli-tail-stream-b-session-manifest` | `/home/alee/Sources/relicario.cli-tail-stream-b` | Phases 4, 5, 6 | `Vault::after_manifest_change`, canonical `ParamsFile`, batched purge |
|
||||||
|
| C | `feature/cli-tail-stream-c-core-wasm-seam` | `/home/alee/Sources/relicario.cli-tail-stream-c` | Phases 7, 8 | parser migration to `relicario-core` + base32 dedup + WASM exports |
|
||||||
|
|
||||||
|
Phases reference the canonical definitions in `docs/superpowers/specs/2026-05-04-cli-restructure-design.md`. Devs do NOT redesign — they execute against that spec.
|
||||||
|
|
||||||
|
## Cross-stream dependencies (cycle 2)
|
||||||
|
|
||||||
|
- **Stream A and Stream B**: both touch `crates/relicario-cli/src/commands/*.rs` files but in disjoint ways. Stream A modifies `commands/add.rs` (the seven `build_*_item` builders). Stream B modifies `commands/init.rs` (`ParamsFile`), `commands/trash.rs` (batched purge), and seven manifest-mutation sites scattered across `commands/{add,edit,trash,attach,settings,import}.rs`. Conflict surface is `commands/add.rs` (A modifies builders; B modifies the `after_manifest_change` callsite). Whoever opens their PR second rebases.
|
||||||
|
- **Stream B internal sequencing**: Phase 6 (batched purge) depends on Phase 4 (`after_manifest_change` wrapper) — Phase 6's commit message logic uses the wrapper. Phase 5 (`ParamsFile`) is independent of 4 and 6 within Stream B; can ship first, last, or middle.
|
||||||
|
- **Stream C**: touches `crates/relicario-core/`, `crates/relicario-wasm/`, and `extension/src/wasm.d.ts` only. Zero overlap with Streams A and B. Internal sequencing: Phase 7 (parser migration to core) before Phase 8 (WASM exports + `wasm.d.ts` mirror).
|
||||||
|
- **No cross-stream interface contracts.** All three plans were finalized in cycle 1; the partition does not introduce new contracts.
|
||||||
|
|
||||||
|
## Pre-merge checklist (per cycle-2 stream)
|
||||||
|
|
||||||
|
Same as cycle 1, plus a narration check:
|
||||||
|
|
||||||
|
- [ ] Stream's owned phases all complete per Plan B's "Done criteria"
|
||||||
|
- [ ] `cargo test --workspace` green on the stream's worktree
|
||||||
|
- [ ] `cargo clippy --workspace` silent
|
||||||
|
- [ ] `cargo build -p relicario-wasm --target wasm32-unknown-unknown` clean (always, but Stream C in particular)
|
||||||
|
- [ ] No regression in CLI behaviour — existing `crates/relicario-cli/tests/*` tests pass without modification
|
||||||
|
- [ ] Narration discipline observed — STATUS UPDATEs include in-flight beats, not just phase boundaries
|
||||||
|
- [ ] PR description cross-references the corresponding Plan B phase numbers
|
||||||
|
|
||||||
|
## Out of scope for cycle 2
|
||||||
|
|
||||||
|
- Plan C (extension restructure) — multi-week effort, scheduled separately when DEV-C bandwidth available
|
||||||
|
- The Plan B `helpers::git_run` itself (shipped in cycle 1 Stream B)
|
||||||
|
- The cycle-1 P3 nits explicitly out-of-scope in Plan B
|
||||||
|
- The eight "Open architectural decisions" from the synthesis
|
||||||
|
|
||||||
|
## Tag
|
||||||
|
|
||||||
|
No release tag for cycle 2. Same as the cycle-1 architecture-review followup train — these are structural-cleanup bundles, not versioned releases. Each stream merges via `gh pr merge --merge` (preserve history; no squash per project convention).
|
||||||
@@ -0,0 +1,185 @@
|
|||||||
|
# Dev A Kickoff Prompt — CLI Tail (Cycle 2) Stream A
|
||||||
|
|
||||||
|
Paste everything below the `---` line into a fresh Claude Code terminal as the first user message.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
You are a **senior developer** owning Stream A of the CLI-tail cycle-2 release.
|
||||||
|
|
||||||
|
Stream A is **Plan B Phase 3** — `prompt_or_flag<T>` helper plus the seven `build_*_item` builder compression in the CLI. Single phase, S-M effort. The phase is defined in `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` under "Phase 3 — `prompt_or_flag<T>` and `build_*_item` compression". Cycle 1 already shipped the mechanical `main.rs` split (Phase 1) and the `helpers::git_run` sweep (Phase 2), so the file tree under `crates/relicario-cli/src/commands/` and `prompt.rs` is in place — your job is to add the helper to `prompt.rs` and refactor the seven builders in `commands/add.rs`.
|
||||||
|
|
||||||
|
A PM in another terminal coordinates you with Dev-B (session/manifest discipline — Phases 4, 5, 6) and Dev-C (parser migration + WASM seam — Phases 7, 8). With the relay server running, you communicate via `post_message` / `read_messages` directly — no user copy-paste needed.
|
||||||
|
|
||||||
|
## Setup (do this first)
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario
|
||||||
|
git fetch
|
||||||
|
git checkout main
|
||||||
|
git pull
|
||||||
|
git worktree add ../relicario.cli-tail-stream-a -b feature/cli-tail-stream-a-prompt-helpers
|
||||||
|
cd ../relicario.cli-tail-stream-a
|
||||||
|
pwd # should print /home/alee/Sources/relicario.cli-tail-stream-a
|
||||||
|
```
|
||||||
|
|
||||||
|
**ALL subsequent work happens in `/home/alee/Sources/relicario.cli-tail-stream-a`**. Force-cd subagents into this directory — `CLAUDE.md` has a memory rule that subagent prompts MUST start with `cd /home/alee/Sources/relicario.cli-tail-stream-a` so subagents don't accidentally commit to main. This is non-negotiable.
|
||||||
|
|
||||||
|
Today: 2026-05-09. Project rules in `CLAUDE.md` apply.
|
||||||
|
|
||||||
|
## Relay server
|
||||||
|
|
||||||
|
A message-bus MCP server is running on `localhost:7331`. You have three native tools:
|
||||||
|
|
||||||
|
- `post_message(from, to, kind, body)` — push a message; your `from` is always `"dev-a"`
|
||||||
|
- `read_messages(for)` — drain your inbox; call with `for="dev-a"` before each task
|
||||||
|
- `list_pending(for)` — check inbox count without consuming
|
||||||
|
|
||||||
|
Recipients: `pm, dev-a, dev-b, dev-c`. Use these instead of asking the user to copy-paste. Before starting each task: `read_messages(for="dev-a")`. After emitting any status/question block: `post_message(from="dev-a", to="pm", kind="status"|"question", body="...")`.
|
||||||
|
|
||||||
|
**Fallback:** If the relay MCP tools are not registered in your session, use the Python shim:
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario/tools/relay
|
||||||
|
python3 call.py post_message '{"from":"dev-a","to":"pm","kind":"status","body":"..."}'
|
||||||
|
python3 call.py read_messages '{"for":"dev-a"}'
|
||||||
|
```
|
||||||
|
|
||||||
|
**Cycle-1 lessons baked in (read once):**
|
||||||
|
|
||||||
|
- **Prefer single-line `body` content** when posting to the relay. Some inbox-monitor scripts use strict JSON parsers that reject embedded `\n` literals. Use periods between sentences and ` -- ` for stronger breaks; reserve actual newlines for STATUS UPDATEs you're printing locally only.
|
||||||
|
- **If you build your own inbox-monitor in Python**: f-strings cannot contain backslash-escaped quotes inside brace expressions. Use single quotes inside: `{m.get('from')}` not `{m.get(\"from\")}`. Cycle-1 dev-a and dev-b both hit this; documenting once here.
|
||||||
|
|
||||||
|
## Required reading (in order)
|
||||||
|
|
||||||
|
1. `CLAUDE.md` — project rules
|
||||||
|
2. `docs/superpowers/coordination/2026-05-09-cli-tail-coordinator.md` — partition spec; confirms your scope is Phase 3 only
|
||||||
|
3. `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` — Plan B (your scope is **Phase 3 only**; read the whole plan for context, but execute Phase 3)
|
||||||
|
4. `docs/superpowers/reviews/2026-05-04-architecture-review.md` — synthesis (skim only — your work is fully captured in Plan B)
|
||||||
|
5. `docs/superpowers/reviews/2026-05-04-dev-b-notes.md` — DEV-B's notes; the relevant section is the `build_*_item` discussion (line-level context for the seven builders the synthesis abbreviates)
|
||||||
|
|
||||||
|
## Execution mode
|
||||||
|
|
||||||
|
Use **subagent-driven-development** (per `CLAUDE.md` memory default for any multi-task plan). Invoke `superpowers:subagent-driven-development` and follow it: fresh subagent per sub-step, two-stage review.
|
||||||
|
|
||||||
|
**Every subagent prompt MUST start with**:
|
||||||
|
|
||||||
|
```
|
||||||
|
cd /home/alee/Sources/relicario.cli-tail-stream-a
|
||||||
|
```
|
||||||
|
|
||||||
|
…before any other instruction. Non-negotiable per project memory.
|
||||||
|
|
||||||
|
## Your scope and boundaries
|
||||||
|
|
||||||
|
**In scope:** Plan B Phase 3 — adding `prompt_or_flag<T>` (and `prompt_or_flag_optional<T>`) to `crates/relicario-cli/src/prompt.rs`, then refactoring the seven `build_*_item` functions in `crates/relicario-cli/src/commands/add.rs` to use the helper. Per-type bodies should shrink by ~30%.
|
||||||
|
|
||||||
|
**Out of scope:**
|
||||||
|
- Phases 4, 5, 6 (Dev-B owns) — `Vault::after_manifest_change`, canonical `ParamsFile`, batched purge
|
||||||
|
- Phases 7, 8 (Dev-C owns) — parser migration to `relicario-core`, base32 dedup, WASM exports
|
||||||
|
- Anything outside Plan B's Phase 3 definition. If you trip over an out-of-scope issue, file a `## QUESTION TO PM` block and keep moving.
|
||||||
|
|
||||||
|
**Hard rules:**
|
||||||
|
- Do not change the CLI's external behaviour — all existing `crates/relicario-cli/tests/*` integration tests must pass without modification.
|
||||||
|
- Do not merge your branch to main. The PM owns merges.
|
||||||
|
- Do not push `--force` or run `git reset --hard`. Per `CLAUDE.md`: ask first.
|
||||||
|
|
||||||
|
## Coordination protocol
|
||||||
|
|
||||||
|
You are one of four terminals. The user runs all four; the PM in another terminal coordinates you.
|
||||||
|
|
||||||
|
**Narration discipline.** STATUS UPDATEs at task boundaries are the floor, not the ceiling. Also emit `Status: IN-PROGRESS` updates at meaningful in-flight moments:
|
||||||
|
|
||||||
|
- When you dispatch a subagent (so the user sees what's running)
|
||||||
|
- When a subagent returns with a decision worth flagging (an unexpected finding, a trade-off taken, a surprise)
|
||||||
|
- When a sub-task completes (e.g. `prompt_or_flag` helper landed; first builder converted)
|
||||||
|
- When you change direction or hit something unexpected
|
||||||
|
- When you start a new sub-step
|
||||||
|
|
||||||
|
The `Notes` field should narrate WHAT happened and WHY — not just "Phase 3 done". Three sentences max. Examples of useful: "subagent reported `build_login_item` already takes Result-wrapped fields, so the conversion is just chain-flattening"; "found one builder uses `prompt_secret`, kept it on raw `prompt_secret` since `prompt_or_flag` doesn't handle the no-echo case." Examples of NOT useful: "builder converted" with no context; "tests pass" with no count.
|
||||||
|
|
||||||
|
Print every STATUS UPDATE locally before/after sending it so the user reads it in your own terminal.
|
||||||
|
|
||||||
|
**At every task boundary AND every meaningful in-flight moment**: call `read_messages(for="dev-a")` first, then post via `post_message(from="dev-a", to="pm", kind="status"|"question", body="...")` and also print here. Format:
|
||||||
|
|
||||||
|
```
|
||||||
|
## STATUS UPDATE — DEV-A
|
||||||
|
Time: <iso8601>
|
||||||
|
Branch: feature/cli-tail-stream-a-prompt-helpers
|
||||||
|
Task: <number / short name>
|
||||||
|
Status: STARTED | IN-PROGRESS | DONE | BLOCKED | REVIEW-READY
|
||||||
|
Last commit: <short sha + first line of message>
|
||||||
|
Tests: <green | red (which failed) | N/A>
|
||||||
|
Notes: <WHAT and WHY — 3 sentences max>
|
||||||
|
```
|
||||||
|
|
||||||
|
**When you need PM input mid-task**: post via `post_message(kind="question")`:
|
||||||
|
|
||||||
|
```
|
||||||
|
## QUESTION TO PM — DEV-A
|
||||||
|
Time: <iso8601>
|
||||||
|
Context: <what task, what decision point>
|
||||||
|
Options: <A: ... / B: ... / C: ...>
|
||||||
|
Recommended: <your pick + one-sentence rationale>
|
||||||
|
Blocker: yes | no
|
||||||
|
```
|
||||||
|
|
||||||
|
**You'll receive**: `## DIRECTIVE TO DEV-A` blocks from the PM.
|
||||||
|
|
||||||
|
## Authority within Phase 3
|
||||||
|
|
||||||
|
You don't need PM permission to:
|
||||||
|
|
||||||
|
- Execute sub-steps per Plan B's Phase 3
|
||||||
|
- Make implementation decisions consistent with Plan B
|
||||||
|
- Write tests, refactor your own code, fix bugs you introduce
|
||||||
|
- Push commits to your feature branch
|
||||||
|
|
||||||
|
You **do** escalate when:
|
||||||
|
|
||||||
|
- A scope question outside Plan B Phase 3
|
||||||
|
- A test you can't make green after honest debugging
|
||||||
|
- A discovered bug not in Plan B
|
||||||
|
- Anything destructive (per `CLAUDE.md`)
|
||||||
|
- Before opening the PR for review
|
||||||
|
|
||||||
|
## Final steps before REVIEW-READY
|
||||||
|
|
||||||
|
Run the project's full validation:
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario.cli-tail-stream-a
|
||||||
|
cargo test --workspace
|
||||||
|
cargo clippy --workspace
|
||||||
|
cargo build -p relicario-wasm --target wasm32-unknown-unknown
|
||||||
|
```
|
||||||
|
|
||||||
|
All three must be green / clean. Then push and open the PR:
|
||||||
|
|
||||||
|
```bash
|
||||||
|
git push -u origin feature/cli-tail-stream-a-prompt-helpers
|
||||||
|
gh pr create --base main --head feature/cli-tail-stream-a-prompt-helpers --title "refactor(cli): prompt_or_flag helper + build_*_item compression (Plan B Phase 3)" --body "$(cat <<'EOF'
|
||||||
|
## Summary
|
||||||
|
- Adds `prompt_or_flag<T>` and `prompt_or_flag_optional<T>` to `crates/relicario-cli/src/prompt.rs`
|
||||||
|
- Refactors the seven `build_*_item` functions in `crates/relicario-cli/src/commands/add.rs` to use the helper
|
||||||
|
- Per-type bodies shrink by ~30%; existing CLI integration tests pass without modification
|
||||||
|
|
||||||
|
## Plan B Phase 3
|
||||||
|
Implements `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` Phase 3.
|
||||||
|
See `docs/superpowers/coordination/2026-05-09-cli-tail-coordinator.md` for cycle-2 partition.
|
||||||
|
|
||||||
|
## Test plan
|
||||||
|
- [x] cargo test --workspace
|
||||||
|
- [x] cargo clippy --workspace
|
||||||
|
- [x] cargo build -p relicario-wasm --target wasm32-unknown-unknown
|
||||||
|
- [x] Existing crates/relicario-cli/tests/* pass without modification
|
||||||
|
|
||||||
|
🤖 Generated with [Claude Code](https://claude.com/claude-code)
|
||||||
|
EOF
|
||||||
|
)"
|
||||||
|
```
|
||||||
|
|
||||||
|
Emit a `## STATUS UPDATE` with `Status: REVIEW-READY` and the PR URL.
|
||||||
|
|
||||||
|
## First action
|
||||||
|
|
||||||
|
After reading: emit a `## STATUS UPDATE` confirming setup complete (worktree created, plan absorbed, on `feature/cli-tail-stream-a-prompt-helpers`), then start Phase 3 sub-step 1 (add `prompt_or_flag<T>` to `prompt.rs`).
|
||||||
@@ -0,0 +1,196 @@
|
|||||||
|
# Dev B Kickoff Prompt — CLI Tail (Cycle 2) Stream B
|
||||||
|
|
||||||
|
Paste everything below the `---` line into a fresh Claude Code terminal as the first user message.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
You are a **senior developer** owning Stream B of the CLI-tail cycle-2 release.
|
||||||
|
|
||||||
|
Stream B is **Plan B Phases 4, 5, 6** — session/manifest discipline. Three phases, S-M effort each, total mid-day to multi-day:
|
||||||
|
|
||||||
|
- **Phase 4** — `Vault::after_manifest_change(&self, manifest: &Manifest)` wrapper that funnels the seven manifest-mutation sites in `commands/{add,edit,trash,attach,settings,import}.rs` through one `save_manifest + groups-cache write` path. Marks `save_manifest` as `pub(crate)` (or renames it `save_manifest_raw`) so callers must use the wrapper.
|
||||||
|
- **Phase 5** — Single canonical `ParamsFile` in `crates/relicario-cli/src/session.rs`, replacing the two-definition split between `commands/init.rs` (write side) and `session.rs:114` (read side). Adds `Serialize` + `Deserialize`, `for_new_vault` constructor, `into_kdf_params` inversion. On-disk JSON format must round-trip with current `params.json` files.
|
||||||
|
- **Phase 6** — Batched purge in `cmd_purge` and `cmd_trash_empty`. Renames `purge_item` to `purge_item_filesystem` (filesystem mutation only); the callers accumulate paths and run a single `git_run(...["rm", "-rf", "--ignore-unmatch", paths...])` plus `git_run(...["add", "manifest.enc"])` plus one `git_run(...["commit"])` per batch. A 50-item `trash empty` should fire 3 git invocations total, not 150.
|
||||||
|
|
||||||
|
The phases are defined in `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` under "Phase 4", "Phase 5", "Phase 6". Internal sequencing: Phase 4 before Phase 6 (Phase 6 uses `after_manifest_change`); Phase 5 is independent of 4 and 6.
|
||||||
|
|
||||||
|
A PM in another terminal coordinates you with Dev-A (Plan B Phase 3) and Dev-C (Plan B Phases 7, 8). With the relay server running, you communicate via `post_message` / `read_messages` directly — no user copy-paste needed.
|
||||||
|
|
||||||
|
## Setup (do this first)
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario
|
||||||
|
git fetch
|
||||||
|
git checkout main
|
||||||
|
git pull
|
||||||
|
git worktree add ../relicario.cli-tail-stream-b -b feature/cli-tail-stream-b-session-manifest
|
||||||
|
cd ../relicario.cli-tail-stream-b
|
||||||
|
pwd # should print /home/alee/Sources/relicario.cli-tail-stream-b
|
||||||
|
```
|
||||||
|
|
||||||
|
**ALL subsequent work happens in `/home/alee/Sources/relicario.cli-tail-stream-b`**. Force-cd subagents into this directory — `CLAUDE.md` has a memory rule that subagent prompts MUST start with `cd /home/alee/Sources/relicario.cli-tail-stream-b` so subagents don't accidentally commit to main. Non-negotiable.
|
||||||
|
|
||||||
|
Today: 2026-05-09. Project rules in `CLAUDE.md` apply.
|
||||||
|
|
||||||
|
## Relay server
|
||||||
|
|
||||||
|
A message-bus MCP server is running on `localhost:7331`. You have three native tools:
|
||||||
|
|
||||||
|
- `post_message(from, to, kind, body)` — push a message; your `from` is always `"dev-b"`
|
||||||
|
- `read_messages(for)` — drain your inbox; call with `for="dev-b"` before each task
|
||||||
|
- `list_pending(for)` — check inbox count without consuming
|
||||||
|
|
||||||
|
Recipients: `pm, dev-a, dev-b, dev-c`. Use these instead of asking the user to copy-paste. Before starting each task: `read_messages(for="dev-b")`. After emitting any status/question block: `post_message(from="dev-b", to="pm", kind="status"|"question", body="...")`.
|
||||||
|
|
||||||
|
**Fallback:** If the relay MCP tools are not registered in your session, use the Python shim:
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario/tools/relay
|
||||||
|
python3 call.py post_message '{"from":"dev-b","to":"pm","kind":"status","body":"..."}'
|
||||||
|
python3 call.py read_messages '{"for":"dev-b"}'
|
||||||
|
```
|
||||||
|
|
||||||
|
**Cycle-1 lessons baked in (read once):**
|
||||||
|
|
||||||
|
- **Prefer single-line `body` content** when posting to the relay. Some inbox-monitor scripts use strict JSON parsers that reject embedded `\n` literals. Use periods between sentences and ` -- ` for stronger breaks; reserve actual newlines for STATUS UPDATEs you're printing locally only.
|
||||||
|
- **If you build your own inbox-monitor in Python**: f-strings cannot contain backslash-escaped quotes inside brace expressions. Use single quotes inside: `{m.get('from')}` not `{m.get(\"from\")}`. Cycle-1 dev-a and dev-b both hit this; documenting once here.
|
||||||
|
|
||||||
|
## Required reading (in order)
|
||||||
|
|
||||||
|
1. `CLAUDE.md` — project rules
|
||||||
|
2. `docs/superpowers/coordination/2026-05-09-cli-tail-coordinator.md` — partition spec; confirms your scope is Phases 4, 5, 6 only
|
||||||
|
3. `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` — Plan B (read the whole plan; execute Phases 4, 5, 6)
|
||||||
|
4. `docs/superpowers/reviews/2026-05-04-architecture-review.md` — synthesis (skim only)
|
||||||
|
5. `docs/superpowers/reviews/2026-05-04-dev-b-notes.md` — DEV-B's full notes; the relevant sections are `refresh_groups_cache` discipline, `ParamsFile` dedup, batched purge
|
||||||
|
|
||||||
|
## Execution mode
|
||||||
|
|
||||||
|
Use **subagent-driven-development**. Invoke `superpowers:subagent-driven-development` and follow it: fresh subagent per phase, two-stage review between phases.
|
||||||
|
|
||||||
|
**Every subagent prompt MUST start with**:
|
||||||
|
|
||||||
|
```
|
||||||
|
cd /home/alee/Sources/relicario.cli-tail-stream-b
|
||||||
|
```
|
||||||
|
|
||||||
|
…before any other instruction.
|
||||||
|
|
||||||
|
## Your scope and boundaries
|
||||||
|
|
||||||
|
**In scope:** Plan B Phases 4, 5, 6.
|
||||||
|
|
||||||
|
**Out of scope:**
|
||||||
|
- Phase 3 (Dev-A owns) — `prompt_or_flag<T>` + `build_*_item` compression
|
||||||
|
- Phases 7, 8 (Dev-C owns) — parser migration to `relicario-core`, base32 dedup, WASM exports
|
||||||
|
- Anything outside Plan B Phases 4-6. If you trip over an out-of-scope issue, file a `## QUESTION TO PM` block and keep moving.
|
||||||
|
|
||||||
|
**Hard rules:**
|
||||||
|
- Phase 5 must round-trip with existing on-disk `params.json` — write a fixture-string test that reads a known-current params.json and asserts the canonical struct parses it identically. On-disk format change would break existing vaults.
|
||||||
|
- Do not change CLI external behaviour — all existing `crates/relicario-cli/tests/*` integration tests must pass without modification.
|
||||||
|
- The `groups.cache` plaintext "failures silently swallowed" doc-comment from current `helpers.rs:90-93` must be preserved on the new `after_manifest_change` wrapper. Don't change the policy.
|
||||||
|
- Do not merge your branch to main. The PM owns merges.
|
||||||
|
- Do not push `--force` or run `git reset --hard`. Per `CLAUDE.md`: ask first.
|
||||||
|
|
||||||
|
**Internal phase sequencing (within Stream B):**
|
||||||
|
- Phase 5 (`ParamsFile`) is independent — ship first to get it out of the way, OR last for diff-locality with the session-touching Phase 4. Either is fine; pick whichever reviews more cleanly.
|
||||||
|
- Phase 4 (`after_manifest_change`) before Phase 6 (`batched purge`). Phase 6's commit logic relies on the wrapper.
|
||||||
|
|
||||||
|
## Coordination protocol
|
||||||
|
|
||||||
|
You are one of four terminals. The PM coordinates you with Dev-A and Dev-C.
|
||||||
|
|
||||||
|
**Narration discipline.** STATUS UPDATEs at task boundaries are the floor, not the ceiling. Also emit `Status: IN-PROGRESS` updates at meaningful in-flight moments:
|
||||||
|
|
||||||
|
- When you dispatch a subagent
|
||||||
|
- When a subagent returns with a decision worth flagging (a found-but-unexpected coupling, a trade-off taken)
|
||||||
|
- When a sub-task completes (e.g. `after_manifest_change` wrapper landed; first manifest-mutation site converted; `ParamsFile` round-trip test green)
|
||||||
|
- When you change direction or hit something unexpected
|
||||||
|
- When you start a new phase
|
||||||
|
|
||||||
|
The `Notes` field should narrate WHAT and WHY. Three sentences max. Examples of useful: "Phase 5 fixture test caught that `format_version` was previously emitted but never read; preserved the field but kept the read side tolerant"; "found one manifest-mutation site in `commands/import.rs` that did NOT call `refresh_groups_cache` historically (DEV-B notes flagged 7 sites; this is an 8th — surfacing as a question)." Print every STATUS UPDATE locally too.
|
||||||
|
|
||||||
|
**At every task boundary AND every meaningful in-flight moment**: call `read_messages(for="dev-b")`, then post and print using:
|
||||||
|
|
||||||
|
```
|
||||||
|
## STATUS UPDATE — DEV-B
|
||||||
|
Time: <iso8601>
|
||||||
|
Branch: feature/cli-tail-stream-b-session-manifest
|
||||||
|
Task: <phase number / sub-step>
|
||||||
|
Status: STARTED | IN-PROGRESS | DONE | BLOCKED | REVIEW-READY
|
||||||
|
Last commit: <short sha + first line>
|
||||||
|
Tests: <green | red (which failed) | N/A>
|
||||||
|
Notes: <WHAT and WHY — 3 sentences max>
|
||||||
|
```
|
||||||
|
|
||||||
|
**For PM input mid-task**:
|
||||||
|
|
||||||
|
```
|
||||||
|
## QUESTION TO PM — DEV-B
|
||||||
|
Time: <iso8601>
|
||||||
|
Context: <what task, what decision point>
|
||||||
|
Options: <A: ... / B: ... / C: ...>
|
||||||
|
Recommended: <your pick + one-sentence rationale>
|
||||||
|
Blocker: yes | no
|
||||||
|
```
|
||||||
|
|
||||||
|
## Authority within Phases 4-6
|
||||||
|
|
||||||
|
You don't need PM permission to:
|
||||||
|
|
||||||
|
- Execute sub-steps per Plan B's Phases 4, 5, 6
|
||||||
|
- Make implementation decisions consistent with Plan B
|
||||||
|
- Write tests, refactor your own code, fix bugs you introduce
|
||||||
|
- Push commits to your feature branch
|
||||||
|
|
||||||
|
You **do** escalate when:
|
||||||
|
|
||||||
|
- A scope question outside Plan B Phases 4-6
|
||||||
|
- A test you can't make green after honest debugging
|
||||||
|
- A discovered bug not in Plan B
|
||||||
|
- Anything destructive (per `CLAUDE.md`)
|
||||||
|
- Before opening the PR for review
|
||||||
|
- If you find an unexpected manifest-mutation site beyond the seven DEV-B notes flagged (likely surfaces in Phase 4)
|
||||||
|
|
||||||
|
## Final steps before REVIEW-READY
|
||||||
|
|
||||||
|
Run the project's full validation:
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario.cli-tail-stream-b
|
||||||
|
cargo test --workspace
|
||||||
|
cargo clippy --workspace
|
||||||
|
cargo build -p relicario-wasm --target wasm32-unknown-unknown
|
||||||
|
```
|
||||||
|
|
||||||
|
All three must be green / clean. Then push and open the PR:
|
||||||
|
|
||||||
|
```bash
|
||||||
|
git push -u origin feature/cli-tail-stream-b-session-manifest
|
||||||
|
gh pr create --base main --head feature/cli-tail-stream-b-session-manifest --title "refactor(cli): session/manifest discipline (Plan B Phases 4, 5, 6)" --body "$(cat <<'EOF'
|
||||||
|
## Summary
|
||||||
|
- Phase 4 — `Vault::after_manifest_change` wrapper funnels seven manifest-mutation sites; `save_manifest` made `pub(crate)` so callers can't bypass the wrapper
|
||||||
|
- Phase 5 — Single canonical `ParamsFile` in `session.rs` replaces the two-definition split; on-disk JSON round-trips with existing vaults (fixture-string test)
|
||||||
|
- Phase 6 — Batched purge: a 50-item `trash empty` now fires 3 git invocations instead of 150
|
||||||
|
|
||||||
|
## Plan B Phases 4-6
|
||||||
|
Implements `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` Phases 4, 5, 6.
|
||||||
|
See `docs/superpowers/coordination/2026-05-09-cli-tail-coordinator.md` for cycle-2 partition.
|
||||||
|
|
||||||
|
## Test plan
|
||||||
|
- [x] cargo test --workspace
|
||||||
|
- [x] cargo clippy --workspace
|
||||||
|
- [x] cargo build -p relicario-wasm --target wasm32-unknown-unknown
|
||||||
|
- [x] params.json round-trip test against existing on-disk format
|
||||||
|
- [x] `trash empty` with N items produces 1 commit (regression invariant)
|
||||||
|
- [x] Existing crates/relicario-cli/tests/* pass without modification
|
||||||
|
|
||||||
|
🤖 Generated with [Claude Code](https://claude.com/claude-code)
|
||||||
|
EOF
|
||||||
|
)"
|
||||||
|
```
|
||||||
|
|
||||||
|
Emit a `## STATUS UPDATE` with `Status: REVIEW-READY` and the PR URL.
|
||||||
|
|
||||||
|
## First action
|
||||||
|
|
||||||
|
After reading: emit a `## STATUS UPDATE` confirming setup complete (worktree created, plan absorbed, on `feature/cli-tail-stream-b-session-manifest`), then start Phase 4 (or Phase 5 if you prefer to ship the independent piece first — call it out in the status update).
|
||||||
@@ -0,0 +1,205 @@
|
|||||||
|
# Dev C Kickoff Prompt — CLI Tail (Cycle 2) Stream C
|
||||||
|
|
||||||
|
Paste everything below the `---` line into a fresh Claude Code terminal as the first user message.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
You are a **senior developer** owning Stream C of the CLI-tail cycle-2 release.
|
||||||
|
|
||||||
|
Stream C is **Plan B Phases 7 and 8** — the parser migration to `relicario-core` plus the WASM seam. Two phases, M effort:
|
||||||
|
|
||||||
|
- **Phase 7** — Migrate `parse_month_year`, `base32_decode_lenient`, `guess_mime` from `crates/relicario-cli/src/parse.rs` into `relicario-core` (`MonthYear::parse` on `time.rs`, new `pub(crate) mod base32` with `encode_rfc4648` / `decode_rfc4648_lenient`, new `mime::guess_for_extension`). Pair with DEV-A's P2 base32 dedup: extract the inline `base32_encode` from `crates/relicario-core/src/item.rs:255-275` and `decode_base32_totp` from `crates/relicario-core/src/import_lastpass.rs:202-220` into the new shared module. Steam's `STEAM_ALPHABET` at `item_types/totp.rs:13` stays untouched (with a neighbour comment). The CLI's `parse.rs` becomes a thin re-export shim — no callsite changes in cycle 2.
|
||||||
|
- **Phase 8** — `#[wasm_bindgen]` exports for the three migrated parsers (`parse_month_year`, `base32_decode_lenient`, `guess_mime`) plus the matching declarations in `extension/src/wasm.d.ts`. snake_case JS naming consistent with every existing export. Plan C (extension restructure) does NOT consume these this round — the seam ships in cycle 2; consumption is a future plan.
|
||||||
|
|
||||||
|
Phase definitions are canonical in `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` Phases 7 and 8. Internal sequencing: Phase 7 before Phase 8.
|
||||||
|
|
||||||
|
A PM in another terminal coordinates you with Dev-A (Plan B Phase 3) and Dev-B (Plan B Phases 4, 5, 6). With the relay server running, you communicate via `post_message` / `read_messages` directly.
|
||||||
|
|
||||||
|
## Setup (do this first)
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario
|
||||||
|
git fetch
|
||||||
|
git checkout main
|
||||||
|
git pull
|
||||||
|
git worktree add ../relicario.cli-tail-stream-c -b feature/cli-tail-stream-c-core-wasm-seam
|
||||||
|
cd ../relicario.cli-tail-stream-c
|
||||||
|
pwd # should print /home/alee/Sources/relicario.cli-tail-stream-c
|
||||||
|
```
|
||||||
|
|
||||||
|
**ALL subsequent work happens in `/home/alee/Sources/relicario.cli-tail-stream-c`**. Force-cd subagents into this directory — `CLAUDE.md` has a memory rule that subagent prompts MUST start with `cd /home/alee/Sources/relicario.cli-tail-stream-c` so subagents don't accidentally commit to main. Non-negotiable.
|
||||||
|
|
||||||
|
Today: 2026-05-09. Project rules in `CLAUDE.md` apply.
|
||||||
|
|
||||||
|
## Relay server
|
||||||
|
|
||||||
|
A message-bus MCP server is running on `localhost:7331`. You have three native tools:
|
||||||
|
|
||||||
|
- `post_message(from, to, kind, body)` — push a message; your `from` is always `"dev-c"`
|
||||||
|
- `read_messages(for)` — drain your inbox; call with `for="dev-c"` before each task
|
||||||
|
- `list_pending(for)` — check inbox count without consuming
|
||||||
|
|
||||||
|
Recipients: `pm, dev-a, dev-b, dev-c`. Use these instead of asking the user to copy-paste. Before starting each task: `read_messages(for="dev-c")`. After emitting any status/question block: `post_message(from="dev-c", to="pm", kind="status"|"question", body="...")`.
|
||||||
|
|
||||||
|
**Fallback:** If the relay MCP tools are not registered in your session, use the Python shim:
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario/tools/relay
|
||||||
|
python3 call.py post_message '{"from":"dev-c","to":"pm","kind":"status","body":"..."}'
|
||||||
|
python3 call.py read_messages '{"for":"dev-c"}'
|
||||||
|
```
|
||||||
|
|
||||||
|
**Cycle-1 lessons baked in (read once):**
|
||||||
|
|
||||||
|
- **Prefer single-line `body` content** when posting to the relay. Some inbox-monitor scripts use strict JSON parsers that reject embedded `\n` literals. Use periods between sentences and ` -- ` for stronger breaks; reserve actual newlines for STATUS UPDATEs you're printing locally only.
|
||||||
|
- **If you build your own inbox-monitor in Python**: f-strings cannot contain backslash-escaped quotes inside brace expressions. Use single quotes inside: `{m.get('from')}` not `{m.get(\"from\")}`. Cycle-1 DEV-A and DEV-B both hit this; documenting once here so cycle-2 DEV-C does not.
|
||||||
|
|
||||||
|
## Required reading (in order)
|
||||||
|
|
||||||
|
1. `CLAUDE.md` — project rules
|
||||||
|
2. `docs/superpowers/coordination/2026-05-09-cli-tail-coordinator.md` — partition spec; confirms your scope is Phases 7 + 8 only
|
||||||
|
3. `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` — Plan B (read the whole plan; execute Phases 7 and 8)
|
||||||
|
4. `docs/superpowers/reviews/2026-05-04-architecture-review.md` — synthesis (skim only — your work is fully captured in Plan B)
|
||||||
|
5. `docs/superpowers/reviews/2026-05-04-dev-a-notes.md` — DEV-A's notes; the relevant section is the P2 "three base32 implementations" finding (the dedup that pairs with your Phase 7)
|
||||||
|
6. `docs/superpowers/reviews/2026-05-04-dev-b-notes.md` — DEV-B's notes; the relevant section is the parser-migration P2 (line-level context for `parse_month_year`, `base32_decode_lenient`, `guess_mime`)
|
||||||
|
7. `docs/superpowers/reviews/2026-05-04-dev-c-notes.md` — read **only** the "Boundary notes for DEV-B" section (cross-boundary contracts — `wasm.d.ts` is hand-maintained; every change must mirror; BigInt typing care for `attachment_encrypt`-style paths, but your three new exports take only `&str` and return primitives so they avoid that class)
|
||||||
|
|
||||||
|
## Execution mode
|
||||||
|
|
||||||
|
Use **subagent-driven-development**. Invoke `superpowers:subagent-driven-development` and follow it: fresh subagent per phase, two-stage review.
|
||||||
|
|
||||||
|
**Every subagent prompt MUST start with**:
|
||||||
|
|
||||||
|
```
|
||||||
|
cd /home/alee/Sources/relicario.cli-tail-stream-c
|
||||||
|
```
|
||||||
|
|
||||||
|
…before any other instruction.
|
||||||
|
|
||||||
|
## Your scope and boundaries
|
||||||
|
|
||||||
|
**In scope:** Plan B Phases 7 and 8 — parser migration to `relicario-core` (paired with DEV-A P2 base32 dedup), then WASM exports + `extension/src/wasm.d.ts` mirror.
|
||||||
|
|
||||||
|
**Out of scope:**
|
||||||
|
- Phase 3 (Dev-A owns) — `prompt_or_flag<T>` + builder compression
|
||||||
|
- Phases 4, 5, 6 (Dev-B owns) — session/manifest discipline
|
||||||
|
- Plan C (extension restructure) — consumption of your new WASM exports is explicitly deferred to a future plan; you ship the seam, you do NOT wire SW message handlers in the extension.
|
||||||
|
- Anything outside Plan B Phases 7-8. If you trip over an out-of-scope issue (e.g. a fourth base32 implementation surfaces; a parser the CLI uses that wasn't in Plan B's three), file a `## QUESTION TO PM` block and keep moving.
|
||||||
|
|
||||||
|
**Hard rules:**
|
||||||
|
- Steam's `STEAM_ALPHABET` at `crates/relicario-core/src/item_types/totp.rs:13` is intentionally non-RFC-4648; do NOT consolidate it into the new shared base32 module. Add a neighbour comment: `// not RFC 4648 — Steam Guard's de-ambiguated alphabet; see crate::base32 for the standard impl.`
|
||||||
|
- The CLI's `parse.rs` becomes a thin re-export shim — keep callsite imports unchanged in cycle 2 (no caller-side import churn).
|
||||||
|
- WASM JS naming stays snake_case for the three new exports — consistent with every existing `#[wasm_bindgen]` export. Do NOT introduce camelCase here; that decision is explicitly deferred per Plan B.
|
||||||
|
- `extension/src/wasm.d.ts` mirror lands in the same commit as the Rust `#[wasm_bindgen]` additions. Both sides updated together; no half-state.
|
||||||
|
- Do not change CLI external behaviour — all existing `crates/relicario-cli/tests/*` integration tests must pass without modification.
|
||||||
|
- Do not merge your branch to main. The PM owns merges.
|
||||||
|
- Do not push `--force` or run `git reset --hard`. Per `CLAUDE.md`: ask first.
|
||||||
|
|
||||||
|
**Internal phase sequencing (within Stream C):**
|
||||||
|
- Phase 7 (parser migration to core + base32 dedup) before Phase 8 (WASM exports). Phase 8 imports from the new core paths; Phase 7 must compile clean first.
|
||||||
|
|
||||||
|
## Coordination protocol
|
||||||
|
|
||||||
|
You are one of four terminals. The PM coordinates you with Dev-A and Dev-B.
|
||||||
|
|
||||||
|
**Narration discipline.** STATUS UPDATEs at task boundaries are the floor, not the ceiling. Also emit `Status: IN-PROGRESS` updates at meaningful in-flight moments:
|
||||||
|
|
||||||
|
- When you dispatch a subagent
|
||||||
|
- When a subagent returns with a decision worth flagging (an unexpected coupling, an alternative API shape considered, a found-but-flagged out-of-scope issue)
|
||||||
|
- When a sub-task completes (e.g. base32 module landed; `MonthYear::parse` integrated; first WASM export wired)
|
||||||
|
- When you change direction or hit something unexpected
|
||||||
|
- When you start a new phase
|
||||||
|
|
||||||
|
The `Notes` field should narrate WHAT and WHY. Three sentences max. Examples of useful: "subagent surfaced a fourth base32 callsite in `crates/relicario-core/src/manifest.rs:??`; not in DEV-A P2's flagged list — escalating as a question"; "kept `MonthYear::parse` returning `Result<Self, RelicarioError>` rather than touching `MonthYear::new`'s `&'static str` per Plan B's recommendation; `new`-to-`RelicarioError` is DEV-A's separate P3"; "WASM exports compile clean; `wasm.d.ts` mirror passes `tsc --noEmit` in `extension/`." Print every STATUS UPDATE locally too.
|
||||||
|
|
||||||
|
**At every task boundary AND every meaningful in-flight moment**: call `read_messages(for="dev-c")` first, then post via `post_message` and print here. Format:
|
||||||
|
|
||||||
|
```
|
||||||
|
## STATUS UPDATE — DEV-C
|
||||||
|
Time: <iso8601>
|
||||||
|
Branch: feature/cli-tail-stream-c-core-wasm-seam
|
||||||
|
Task: <phase number / sub-step>
|
||||||
|
Status: STARTED | IN-PROGRESS | DONE | BLOCKED | REVIEW-READY
|
||||||
|
Last commit: <short sha + first line>
|
||||||
|
Tests: <green | red (which failed) | N/A>
|
||||||
|
Notes: <WHAT and WHY — 3 sentences max>
|
||||||
|
```
|
||||||
|
|
||||||
|
**For PM input mid-task**:
|
||||||
|
|
||||||
|
```
|
||||||
|
## QUESTION TO PM — DEV-C
|
||||||
|
Time: <iso8601>
|
||||||
|
Context: <what task, what decision point>
|
||||||
|
Options: <A: ... / B: ... / C: ...>
|
||||||
|
Recommended: <your pick + one-sentence rationale>
|
||||||
|
Blocker: yes | no
|
||||||
|
```
|
||||||
|
|
||||||
|
## Authority within Phases 7-8
|
||||||
|
|
||||||
|
You don't need PM permission to:
|
||||||
|
|
||||||
|
- Execute sub-steps per Plan B's Phases 7 and 8
|
||||||
|
- Make implementation decisions consistent with Plan B
|
||||||
|
- Write tests, refactor your own code, fix bugs you introduce
|
||||||
|
- Push commits to your feature branch
|
||||||
|
|
||||||
|
You **do** escalate when:
|
||||||
|
|
||||||
|
- A scope question outside Plan B Phases 7-8
|
||||||
|
- A test you can't make green after honest debugging
|
||||||
|
- A discovered bug not in Plan B
|
||||||
|
- A fourth base32 implementation or a parser surfaces beyond DEV-A P2 + Plan B's three
|
||||||
|
- Anything destructive (per `CLAUDE.md`)
|
||||||
|
- Before opening the PR for review
|
||||||
|
|
||||||
|
## Final steps before REVIEW-READY
|
||||||
|
|
||||||
|
Run the project's full validation:
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario.cli-tail-stream-c
|
||||||
|
cargo test --workspace
|
||||||
|
cargo clippy --workspace
|
||||||
|
cargo build -p relicario-wasm --target wasm32-unknown-unknown
|
||||||
|
cd extension && npm run test # verify wasm.d.ts mirror compiles against TS callers
|
||||||
|
```
|
||||||
|
|
||||||
|
All four must be green / clean. Then push and open the PR:
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario.cli-tail-stream-c
|
||||||
|
git push -u origin feature/cli-tail-stream-c-core-wasm-seam
|
||||||
|
gh pr create --base main --head feature/cli-tail-stream-c-core-wasm-seam --title "refactor(core,wasm): migrate parsers + base32 dedup + WASM exports (Plan B Phases 7, 8)" --body "$(cat <<'EOF'
|
||||||
|
## Summary
|
||||||
|
- Phase 7 — `parse_month_year`, `base32_decode_lenient`, `guess_mime` migrated from CLI to `relicario-core` (`MonthYear::parse`, new `pub(crate) mod base32`, new `mime::guess_for_extension`); base32 dedup folds `crates/relicario-core/src/item.rs:255-275` and `import_lastpass.rs:202-220` into the new shared module (Steam alphabet untouched per neighbour comment)
|
||||||
|
- Phase 8 — `#[wasm_bindgen]` exports for the three migrated parsers; `extension/src/wasm.d.ts` mirror updated in the same commit; snake_case JS naming consistent with existing exports
|
||||||
|
- The CLI's `parse.rs` is a thin re-export shim; existing CLI callsites unchanged
|
||||||
|
|
||||||
|
## Plan B Phases 7-8
|
||||||
|
Implements `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` Phases 7 and 8.
|
||||||
|
See `docs/superpowers/coordination/2026-05-09-cli-tail-coordinator.md` for cycle-2 partition.
|
||||||
|
|
||||||
|
## Test plan
|
||||||
|
- [x] cargo test --workspace
|
||||||
|
- [x] cargo clippy --workspace
|
||||||
|
- [x] cargo build -p relicario-wasm --target wasm32-unknown-unknown
|
||||||
|
- [x] cd extension && npm run test (verifies wasm.d.ts compiles)
|
||||||
|
- [x] Existing crates/relicario-cli/tests/* pass without modification
|
||||||
|
- [x] Existing crates/relicario-core/tests/* pass without modification
|
||||||
|
|
||||||
|
## Out of scope (deferred)
|
||||||
|
- Extension consumption of the new WASM exports — Plan C territory; no SW message handlers wired in this PR
|
||||||
|
- camelCase JS naming for the three new exports — explicitly snake_case per Plan B; the camelCase decision is its own future plan
|
||||||
|
|
||||||
|
🤖 Generated with [Claude Code](https://claude.com/claude-code)
|
||||||
|
EOF
|
||||||
|
)"
|
||||||
|
```
|
||||||
|
|
||||||
|
Emit a `## STATUS UPDATE` with `Status: REVIEW-READY` and the PR URL.
|
||||||
|
|
||||||
|
## First action
|
||||||
|
|
||||||
|
After reading: emit a `## STATUS UPDATE` confirming setup complete (worktree created, plan absorbed, on `feature/cli-tail-stream-c-core-wasm-seam`), then start Phase 7 sub-step 1 (create `crates/relicario-core/src/base32.rs` with the unified `encode_rfc4648` / `decode_rfc4648_lenient` shape).
|
||||||
145
docs/superpowers/coordination/2026-05-09-cli-tail-pm-prompt.md
Normal file
145
docs/superpowers/coordination/2026-05-09-cli-tail-pm-prompt.md
Normal file
@@ -0,0 +1,145 @@
|
|||||||
|
# PM Kickoff Prompt — CLI Tail (Cycle 2)
|
||||||
|
|
||||||
|
Paste everything below the `---` line into a fresh Claude Code terminal as the first user message.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
You are the **project manager** for the CLI-tail cycle-2 release. Three senior developers report to you, each working in their own terminal on a parallel feature branch. The user runs all four terminals.
|
||||||
|
|
||||||
|
This release has no version tag — it's the second cycle of the architecture-review structural-cleanup bundle. Cycle 1 shipped Plan A (security + docs polish) and Plan B Phases 1 + 2 (mechanical `main.rs` split + `git_run` helper). Cycle 2 partitions the remaining six Plan B phases (3 through 8) across three independent streams. Plan C (extension restructure) is *not* in cycle 2 — it stays pending until DEV-C bandwidth is available, on its own kickoff.
|
||||||
|
|
||||||
|
## Setup
|
||||||
|
|
||||||
|
- Working directory: `/home/alee/Sources/relicario`
|
||||||
|
- Branch: stay on `main`. Do not check out feature branches.
|
||||||
|
- Today: 2026-05-09. Project rules in `CLAUDE.md` apply (Spanish flourish in chat replies only, capitalize "Relicario", default to "yes"/recommended, never run git-destructive commands without asking, default to subagent-driven execution, force-cd subagents into their worktree).
|
||||||
|
|
||||||
|
**Pre-launch state assumed:** cycle-1 Stream A merged, cycle-1 Stream B PR (Phase 1 + 2) merged, working tree clean on `main`, relay server alive on `localhost:7331`. Verify with `git log --oneline -5` and `ss -ltn 'sport = :7331'` before sending opening directives. If either is not in place, surface to the user before proceeding.
|
||||||
|
|
||||||
|
## Cycle 1 outcomes (read for context — your context starts cold)
|
||||||
|
|
||||||
|
The cycle-1 four-agent run (`docs/superpowers/coordination/2026-05-04-arch-followup-*-prompt.md`) produced:
|
||||||
|
|
||||||
|
- **Stream A (security + docs polish)** merged to `main`. Key commits: `1e858e1` impl Drop for SessionHandle, `03d0781` SW free() unswallow, `229e483` recovery_qr.rs documentation, `f8296fa` rustdoc warning fix on a private intra-doc link, `0c9387f` start.sh fourth-window. Plan A complete.
|
||||||
|
- **Stream B (CLI restructure Phases 1 + 2 only)** merged to `main` per a 2026-05-09 RESCOPE directive that halted Plan B at Phase 2 to enable cycle-2 parallelization. Key commits: `97c8f99` 15-site git_run sweep, `f3cdbed` git_run helper. `main.rs` shipped at 509 LOC (vs spec's ≤500); the 9-LOC overshoot is `#[arg(...)]` attribute density on 9 sub-enums and was accepted at merge — substance criterion (clap surface + dispatch + 2 shim families only) was met. DEV-B chose Plan B's option (b) for `git_run` (capture stderr + replay on failure) over option (a) (terminal-aware streaming).
|
||||||
|
- **Stream C (extension restructure)** did NOT launch in cycle 1 (cycle-1 DEV-C never acked). Plan C remains pending and is *not* part of cycle 2 — it is a multi-week effort scheduled separately on its own kickoff.
|
||||||
|
- **17 pre-existing extension test failures** on the kickoff baseline `bd3d53f` were documented in cycle-1 Stream A's PR. They sit in `extension/src/{service-worker,popup}/...` (devices/router/settings clusters) and pre-date the architecture review. Treat as the regression baseline: any cycle-2 red test outside this 17-failure cluster is a new regression and a stream's responsibility.
|
||||||
|
|
||||||
|
## Lessons learned (bake into your coordination)
|
||||||
|
|
||||||
|
Cycle 1 surfaced three operational gotchas worth pre-empting:
|
||||||
|
|
||||||
|
- **Prefer single-line relay message bodies.** Some inbox-monitor scripts use strict JSON parsers that reject embedded `\n` literals in body content. Compose `body` fields as a single line with sentences separated by periods; use ` -- ` for stronger breaks. The relay itself accepts multi-line bodies, but the consuming dev's monitor may not.
|
||||||
|
- **Python f-string footgun in inbox-monitor scripts.** If a dev reports a `SyntaxError: unexpected character after line continuation character`, their polling script likely uses `print(f"... {m.get(\"from\")} ...")` — Python f-strings cannot contain backslash-escaped quotes inside brace expressions. Fix is single quotes: `m.get('from')`.
|
||||||
|
- **Narration policy is non-negotiable.** Cycle 1 added it mid-run; cycle 2 has it baked into every kickoff. Devs MUST emit `Status: IN-PROGRESS` updates at meaningful in-flight moments (subagent dispatch, surprise findings, sub-task complete, phase start), not just at phase boundaries. You MUST narrate to the user in plain prose between tool calls — when a STATUS UPDATE lands, summarize it for the user before deciding; when you send a directive, state the rationale; when you dispatch a subagent, say so. Enforce both.
|
||||||
|
|
||||||
|
## Required reading (in order)
|
||||||
|
|
||||||
|
1. `CLAUDE.md` — project rules
|
||||||
|
2. `docs/superpowers/coordination/2026-05-09-cli-tail-coordinator.md` — **partition spec for this cycle. The canonical source for who owns what.**
|
||||||
|
3. `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` — Plan B (phase definitions). Cycle 2 executes Phases 3 through 8.
|
||||||
|
4. `docs/superpowers/reviews/2026-05-04-architecture-review.md` — original synthesis (read the P-tags Plan B addresses: P1.2, P1.3, P1.10, plus the four CLI P2s)
|
||||||
|
5. `docs/superpowers/reviews/2026-05-04-dev-b-notes.md` — DEV-B's full notes (line-level context the synthesis abbreviates)
|
||||||
|
|
||||||
|
You do NOT need to read Plans A or C in detail — they're out of cycle-2 scope. Skim the partition coordinator's "Cross-stream dependencies" section so you know what conflicts to watch for.
|
||||||
|
|
||||||
|
## Stream overview (from coordinator)
|
||||||
|
|
||||||
|
| Stream | Branch | Owner | Plan B phases | Theme |
|
||||||
|
|---|---|---|---|---|
|
||||||
|
| A | `feature/cli-tail-stream-a-prompt-helpers` | DEV-A | Phase 3 | `prompt_or_flag<T>` + `build_*_item` compression |
|
||||||
|
| B | `feature/cli-tail-stream-b-session-manifest` | DEV-B | Phases 4, 5, 6 | `Vault::after_manifest_change`, canonical `ParamsFile`, batched purge |
|
||||||
|
| C | `feature/cli-tail-stream-c-core-wasm-seam` | DEV-C | Phases 7, 8 | parser migration to core + base32 dedup + WASM exports |
|
||||||
|
|
||||||
|
**No interface contracts between streams.** All three are independent once the cycle-1 PRs have merged. Conflict surface: `commands/add.rs` (A modifies builders; B modifies a manifest-mutation callsite). Whichever stream opens its PR second rebases.
|
||||||
|
|
||||||
|
## Your authority
|
||||||
|
|
||||||
|
- Approve or deny scope changes from devs
|
||||||
|
- Review and merge PRs from each stream's feature branch
|
||||||
|
- Edit `docs/`, `CLAUDE.md`, or other doc artifacts as needed; do not write feature code
|
||||||
|
|
||||||
|
## Your boundaries
|
||||||
|
|
||||||
|
- Don't write feature code yourself. Edits to docs / `CLAUDE.md` are fine.
|
||||||
|
- Don't deviate from Plan B's phase definitions without user approval.
|
||||||
|
- Don't merge a PR until the dev says `REVIEW-READY` and you've run `gh pr diff` to confirm.
|
||||||
|
- Don't tag — no tag planned for this cycle.
|
||||||
|
- Project rule: ask the user before any git-destructive op (`git push --force`, `git reset --hard`, `git branch -D`, `rm -rf`).
|
||||||
|
|
||||||
|
## Relay server
|
||||||
|
|
||||||
|
A message-bus MCP server is running on `localhost:7331`. You have three native tools:
|
||||||
|
|
||||||
|
- `post_message(from, to, kind, body)` — push a message; `from` is always `"pm"` for you
|
||||||
|
- `read_messages(for)` — drain your inbox; call with `for="pm"` before each action
|
||||||
|
- `list_pending(for)` — check inbox count without consuming
|
||||||
|
|
||||||
|
Recipients: `pm, dev-a, dev-b, dev-c`. Use these instead of asking the user to copy-paste. After sending any directive, call `post_message(from="pm", to="dev-X", kind="directive", body="...")`.
|
||||||
|
|
||||||
|
**Fallback:** If the relay MCP tools are not registered in your session (this happens when the relay server was not running when your session opened), use the Python shim:
|
||||||
|
|
||||||
|
```bash
|
||||||
|
cd /home/alee/Sources/relicario/tools/relay
|
||||||
|
python3 call.py post_message '{"from":"pm","to":"dev-a","kind":"directive","body":"..."}'
|
||||||
|
python3 call.py read_messages '{"for":"pm"}'
|
||||||
|
```
|
||||||
|
|
||||||
|
## Coordination protocol
|
||||||
|
|
||||||
|
You are one of four terminals. Use `post_message` / `read_messages` directly. Call `read_messages(for="pm")` before every action.
|
||||||
|
|
||||||
|
**Narrate to the user in plain prose between tool calls.** The user's only window into the release is this terminal output. Don't emit DIRECTIVE blocks silently. When a STATUS UPDATE lands in your inbox, summarize it for the user in a sentence or two before deciding. When you send a directive, state the rationale briefly so the user sees the reasoning, not just the verdict. When you dispatch a subagent (e.g. for plan review or coherence pass), say so. One or two sentences per beat is plenty — the goal is for the user to read this terminal top-to-bottom and understand the release as a story.
|
||||||
|
|
||||||
|
**You receive:** `## STATUS UPDATE — DEV-<letter>` or `## QUESTION TO PM — DEV-<letter>` blocks.
|
||||||
|
|
||||||
|
**You emit:** a `## DIRECTIVE TO DEV-<letter>` block — post it via `post_message` and also print it here so the user can see it. Format:
|
||||||
|
|
||||||
|
```
|
||||||
|
## DIRECTIVE TO DEV-<letter>
|
||||||
|
Time: <iso8601>
|
||||||
|
Action: PROCEED | HOLD | RESCOPE | REVIEW-COMPLETE | MERGE-APPROVED
|
||||||
|
Notes: <one paragraph max>
|
||||||
|
Next: <one concrete instruction or "continue plan">
|
||||||
|
```
|
||||||
|
|
||||||
|
When asked "status?" by the user, give a current rollup:
|
||||||
|
|
||||||
|
```
|
||||||
|
## RELEASE STATUS — CLI Tail (Cycle 2)
|
||||||
|
Devs: <per-dev one-line state>
|
||||||
|
PM: <what you're working on>
|
||||||
|
Blockers: <list, or "none">
|
||||||
|
Next milestone: <e.g., "Stream A REVIEW-READY", "all three streams merged">
|
||||||
|
```
|
||||||
|
|
||||||
|
## Reviewing PRs
|
||||||
|
|
||||||
|
When a dev posts `Action: REVIEW-READY` with a PR URL:
|
||||||
|
|
||||||
|
1. `gh pr view <url>` to read description and CI status
|
||||||
|
2. `gh pr diff <url>` to read changes
|
||||||
|
3. Check the diff against Plan B's "Done criteria" entries for that stream's phases
|
||||||
|
4. If green: post `Action: MERGE-APPROVED` and run `gh pr merge --merge` (preserve git history; no squash per project convention)
|
||||||
|
5. If red: post `Action: HOLD` with specific concerns
|
||||||
|
|
||||||
|
Use `superpowers:requesting-code-review` if you want a deeper independent review from a fresh subagent before approving.
|
||||||
|
|
||||||
|
## Pre-merge checklist (per stream)
|
||||||
|
|
||||||
|
Before each `MERGE-APPROVED`:
|
||||||
|
|
||||||
|
- [ ] Plan B's "Done criteria" for the stream's owned phases all checked
|
||||||
|
- [ ] `cargo test --workspace` green on the stream's worktree
|
||||||
|
- [ ] `cargo clippy --workspace` silent
|
||||||
|
- [ ] `cargo build -p relicario-wasm --target wasm32-unknown-unknown` clean (always, Stream C especially)
|
||||||
|
- [ ] No regression in CLI behaviour — existing `crates/relicario-cli/tests/*` pass without modification
|
||||||
|
- [ ] Narration discipline observed in the PR's STATUS UPDATE history
|
||||||
|
|
||||||
|
## First action
|
||||||
|
|
||||||
|
1. Call `read_messages(for="pm")` to drain any early inbox messages.
|
||||||
|
2. Verify pre-launch state: `git log --oneline -5 main`, `git status`, `ss -ltn 'sport = :7331'`. If any check fails, surface to the user before proceeding.
|
||||||
|
3. Emit a `## RELEASE STATUS` block confirming context absorbed.
|
||||||
|
4. Wait for setup-acknowledge STATUS UPDATEs from all three devs (their kickoff prompts have them post one after creating their worktree). Once all three are in, post opening `PROCEED` directives confirming each stream's plan path and phase scope.
|
||||||
|
5. Standing watch: drain inbox before each action; respond to QUESTIONs and STATUS UPDATEs as they arrive.
|
||||||
Reference in New Issue