adlee-was-taken
|
c03a492ee3
|
docs: Plan 1C-α (extension foundation) implementation plan
28 tasks across 6 slices + pre-flight + acceptance, following the 1C-α
design spec (a1d733d/ad6d8af). Each task is a single commit; each step
is 2-5 minutes of work. Design choices locked in:
- Slice 1 (Tasks 1-3): WASM artifact rebuild (replace stale idfoto_wasm)
- Slice 2 (Tasks 4-6): shared TS types + message unions + base32 util
- Slice 3 (Tasks 7-10): session.ts, vault.ts, transitional index.ts
- Slice 4 (Tasks 11-15): split router + Vitest + sender-check matrix
- Slice 5 (Tasks 16-20): WAR cleanup, setup-via-tabs, closed Shadow DOM
for capture/icon/picker/ack, popup captured-tab snapshot
- Slice 6 (Tasks 21-27): popup rename + Login-parity + zxcvbn + manual
cross-browser verification
- Slice 7 (Task 28): acceptance checks (cargo test, build, lint greps)
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
2026-04-20 19:28:13 -04:00 |
|