Commit Graph

2 Commits

Author SHA1 Message Date
adlee-was-taken
7c7efa7c43 release: v0.7.0 — extension restructure complete (Plan C Phases 3/4/6)
Completes the extension restructure begun in v0.6.0. Phases 3 (setup
wizard SW migration + step registry), 4 (vault.ts split + vault_locked
lift), and 6 (get_vault_status + sidebar status indicator) all merged to
main (9df2fee, 3b8368d, 397cc78) via three parallel worktree streams.

This commit is the release-prep wrap-up:
- Version bump to v0.7.0 across the three relicario crates + Cargo.lock,
  extension/package.json, and both extension manifests (the manifests had
  lagged at 0.5.0 — corrected here).
- CHANGELOG.md v0.7.0 entry.
- STATUS.md: extension restructure moved to shipped; Phases 3/4/6 landing
  section added.
- ROADMAP.md: v0.7.0 row added; Up-next now command palette.
- extension/ARCHITECTURE.md: all three phases integrated (new vault-*
  modules, setup-steps.ts, get_vault_status protocol + status indicator,
  vault_locked lift, git-host sync cache).
- Plan completion checkboxes ticked.

Task 7.1 verification: done-criteria sweep all green; 423/423 vitest;
build:all clean (only the pre-existing 4MB WASM size warning).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-05-31 22:50:17 -04:00
adlee-was-taken
4a1c553f9d docs(plan): extension restructure — 6-phase implementation plan
24 tasks across 6 phases derived from the 2026-05-04 extension restructure
spec. Per-task bite-sized steps (TDD where new behavior, verify-existing-
tests where pure relocation) with explicit file/line citations and full
code snippets.

Phase 1 (StateHost typing, S-M, blocks 3+4):     5 tasks
Phase 2 (storage.ts + itemToManifestEntry, S):   3 tasks
Phase 3 (setup wizard SW migration + step registry, L): 7 tasks
Phase 4 (vault.ts split into 5 modules + vault_locked lift, M): 7 tasks
Phase 5 (P2 cluster: timer/gitHost/teardown/allSettled/debounce, M): 5 tasks
Phase 6 (get_vault_status + sidebar status indicator, S-M):     3 tasks
Task 7.1 (final verification sweep against spec Done criteria).

Recommended sequence: 1 → 2 → 5 → 4 → 6 → 3 (independents first, then
the typed-StateHost-dependent phases, then Phase 3 last because it's the
biggest single phase and benefits from all the supporting infra in
place). Max subagent parallelism: 3 streams.

Cross-plan: explicit out-of-scope notes for Plan A (security/docs polish,
already shipped) and Plan B (CLI restructure, already shipped). The
wasm.d.ts file is not touched by this plan (verify empty diff at done).

STATUS + ROADMAP updated to point at the plan.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-30 21:36:55 -04:00