adlee-was-taken
|
34d6155801
|
docs: add v0.7.0 PM/Dev-A/B/C kickoff prompts (extension restructure Phases 3/4/6)
Three-stream multi-agent lift to finish the extension restructure:
- Dev-A = Phase 3 (setup wizard SW migration + step registry; owns messages.ts)
- Dev-B = Phase 4 (split vault.ts into 5 modules + lift vault_locked channel)
- Dev-C = Phase 6 (get_vault_status + sidebar status indicator; deps on A & B)
PM prompt encodes the cross-stream dependency map (shared messages.ts edit,
vault-sidebar.ts footer-slot handoff, merge order P3 -> P4 -> P6) and the
pre-tag checklist. Launch script spawns a 4-window tmux session + relay.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
|
2026-05-31 00:53:43 -04:00 |
|