Files
relicario/ROADMAP.md
adlee-was-taken 0bde0935c2 docs: STATUS/ROADMAP — close out post-audit cleanup iteration
Three commits landed since the prior sync (72a59c6) that should be
reflected here:
- cccb7d7  rule #4 + doc-structure plan ticks
- 39ae629  vault lock-screen logo
- (this commit)

Moves the doc-structure redesign from "in progress" to "complete"
(Task 5 verified clean), drops the lock-screen logo from in-flight,
and trims Up next to the four genuinely-outstanding items: tag cut,
CLI restructure, extension restructure, security polish.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-30 20:12:41 -04:00

3.0 KiB
Raw Blame History

Relicario Roadmap

Living document — update alongside STATUS.md when milestones shift. "Up next" items have specs; "Medium-term" items may have specs; "Long-term" items are direction, not committed scope.

Shipped

Version Highlights
v0.5.x train (on main, untagged — tag pending) Security audit fixes; device authentication; backup/restore + LastPass import; fullscreen UX Phases 1+2A+2B; v0.5.1 Streams A/B/C (3-column vault layout + bottom-sheet picker + toast system; left-nav settings; Recovery QR end-to-end + setup wizard Style C); 1C-γ (attachments + Document type + device registration + trash + field history); Plan B multi-stream refactor (commands/ split, prompt_or_flag, core/WASM seam); vault-tab management surfaces revamp (settings synced/local split, devices fingerprint, trash purge countdown, field-history polish, item-history-index, #history/<id> routing); doc-structure redesign (rename to DESIGN/CRYPTO/docs/FORMATS, scope headers + Next: footers)
v0.2.0 Last tagged release — typed-item rewrite (Plans 1A/1B/1C-α/β₁/β₂)

See CHANGELOG.md for tagged-release detail and STATUS.md for the per-train commit list.

Up next

  • Cut a tag for the v0.5.x train — version was bumped to 0.5.0 on 2026-05-04 but never tagged; scope now exceeds the original v0.5.0 plan. v0.5.1 or v0.6.0 depending on how you read the breadth. Tag-cut needs a CHANGELOG.md entry covering Phase 2B + v0.5.1 Streams A/B/C + 1C-γ + Plan B refactor + management-surfaces revamp + doc-structure redesign.

Medium-term

Specced; no plan yet:

  • CLI restructure — subcommand reorganization, interactive TUI mode Spec: docs/superpowers/specs/2026-05-04-cli-restructure-design.md
  • Extension restructure — bundle / message-routing cleanup Spec: docs/superpowers/specs/2026-05-04-extension-restructure-design.md
  • Security polish — follow-up hardening from the architecture review Spec: docs/superpowers/specs/2026-05-04-security-polish-design.md
  • Phase 4: command palette — ⌘K global search + action dispatch across the vault tab (no spec yet)

Long-term / backlog

  • Relay server — encrypted WebSocket relay for multi-device sync without a shared git server Spec: docs/superpowers/specs/2026-05-02-relay-server-design.md Plan: docs/superpowers/plans/2026-05-02-relay-server.md (c0921b1) Code skeleton: crates/relicario-server/ exists but only houses the pre-receive hook today; the relay binary would either extend or replace it.
  • Mobile — Rust core compiles to ARM; JNI wrapper for Android, Swift wrapper for iOS

Non-goals (explicitly deferred or cancelled)

  • Reference-image rotation — changing the image factor without re-embedding. Back-burner, not cancelled.
  • Per-entry subkeys — no real-world benefit at family-vault scale; see design rationale in docs/CRYPTO.md.
  • libgit2 / gitoxide — shell-out to git is intentional; see crates/relicario-cli/ARCHITECTURE.md.