Generated by /multi-agent-kickoff for the three architecture-review followup plans. PM coordinates; Dev-A owns Plan A (security & docs polish, S, ships first); Dev-B owns Plan B (CLI restructure, M-L); Dev-C owns Plan C (extension restructure, L). Each dev prompt forces cd into its worktree (per project memory rule), includes the relay tool calls + Python shim fallback, scopes hard-rules to the planning subagents' flagged judgment calls, and ships an opinionated PR title + body template that mirrors the plan's Done criteria. PM prompt enforces the cross-plan boundaries: A is independent; B Phase 8 WASM exports are a seam C does not consume in this train; A owns the .free() swallow removal and Drop impl; if both B and C touch wasm.d.ts, B sequences first. Launcher discovers these via `ls -t coordination/*-<role>-prompt.md | head -1` so they take precedence over previous kickoff sets. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
14 KiB
Dev B Kickoff Prompt — arch-followup Plan B
Paste everything below the --- line into a fresh Claude Code terminal as the first user message.
You are a senior developer owning Plan B for the arch-followup "architecture-review followups" release train.
Plan B is the CLI restructure — the "single biggest readability lift" per the synthesis. M-L effort, multi-day. It splits crates/relicario-cli/src/main.rs (2641 LOC) into a commands/ folder + prompt.rs + parse.rs, then layers on the duplicated git-error UX consolidation, manifest-after-mutation cache discipline, ParamsFile dedup, batched purge, and the migration of pure parsers (and a third copy of base32) into relicario-core with WASM re-exports. Eight phases.
A PM in another terminal coordinates you with Dev-A (security & docs polish) and Dev-C (extension restructure). With the relay server running, you communicate via post_message / read_messages directly — no user copy-paste needed. If the relay MCP tools are not registered in your session, use the Python shim fallback (see Relay server section below).
Setup (do this first)
cd /home/alee/Sources/relicario
git fetch
git checkout main
git pull
git worktree add ../relicario-plan-b -b feature/2026-05-04-b-cli-restructure
cd ../relicario-plan-b
pwd # should print /home/alee/Sources/relicario-plan-b (or similar absolute path)
ALL subsequent work happens in /home/alee/Sources/relicario-plan-b. Force-cd subagents into this directory — the project's CLAUDE.md memory rule explicitly requires that subagent prompts MUST start with cd /home/alee/Sources/relicario-plan-b so subagents don't accidentally commit to main. This is non-negotiable.
Today: 2026-05-04. Project rules in CLAUDE.md apply.
Relay server
A message-bus MCP server is running on localhost:7331. You have three native tools:
post_message(from, to, kind, body)— push a message; yourfromis always"dev-b"read_messages(for)— drain your inbox; call withfor="dev-b"before each tasklist_pending(for)— check inbox count without consuming
Recipients: pm, dev-a, dev-b, dev-c. Use these instead of asking the user to copy-paste. Before starting each task: read_messages(for="dev-b"). After emitting any status/question block: post_message(from="dev-b", to="pm", kind="status"|"question", body="...").
Fallback: If the relay MCP tools are not registered in your session, use the Python shim:
cd /home/alee/Sources/relicario/tools/relay
python3 call.py post_message '{"from":"dev-b","to":"pm","kind":"status","body":"..."}'
python3 call.py read_messages '{"for":"dev-b"}'
Required reading (in order)
CLAUDE.md— project rules (Spanish flourish in chat replies only, capitalization, autonomy defaults, CLI/extension parity philosophy)docs/superpowers/reviews/2026-05-04-architecture-review.md— synthesis (your scope is P1.2, P1.3, P1.10 + the in-scope CLI P2s only)docs/superpowers/specs/2026-05-04-cli-restructure-design.md— your plan, execute phase by phasedocs/superpowers/reviews/2026-05-04-dev-b-notes.md— DEV-B's full notes (your primary source for line-level context — the synthesis abbreviates)docs/superpowers/reviews/2026-05-04-dev-c-notes.md— read only the "Boundary notes for DEV-B" section near the end (cross-boundary contracts you must respect when designing the WASM exports for Phase 8)
You do NOT need to read Plan A or Plan C in detail. If a coordination question arises, skim Plan C's "Risks → WASM boundary coordination" paragraph (it cites your Phase 8 explicitly).
Execution mode
Use subagent-driven-development (per project memory's default for any multi-task plan). Invoke superpowers:subagent-driven-development and follow it: fresh subagent per phase, two-stage review between phases.
Every subagent prompt MUST start with:
cd /home/alee/Sources/relicario-plan-b
…before any other instruction. This is non-negotiable per project memory.
Sequencing matters. Phase 1 (the mechanical main.rs split) is the precondition for every other phase — phases 2-6 touch files that don't exist yet until phase 1 lands. Do NOT start phase 2 until phase 1's cargo test --workspace is green and a checkpoint commit is in place.
Your scope and boundaries
In scope:
- Phase 1 — Mechanical split of
main.rsintocommands/{add,get,list,edit,trash,backup,import,attach,settings,sync,status,device,recovery_qr,init,generate,rate}.rs+prompt.rs+parse.rs - Phase 2 —
helpers::git_run+ sweep of the 16bail!("git X failed")sites - Phase 3 —
prompt_or_flag<T>andbuild_*_itemcompression - Phase 4 —
Vault::after_manifest_change+ sweep of the 7refresh_groups_cachesites - Phase 5 — Single canonical
ParamsFile(one definition shared between init writer and unlock reader) - Phase 6 — Batched purge in
cmd_purgeandcmd_trash_empty(3 git invocations for an N-item purge instead of 3N) - Phase 7 — Migrate
parse_month_year/base32_decode_lenient/guess_mimetorelicario-core+pub(crate) mod base32(closes DEV-A's three-base32-impls finding) - Phase 8 — WASM exports for the migrated parsers +
extension/src/wasm.d.tsmirror
Out of scope: anything in Plan A (security/docs polish — Drop impl, recovery_qr docs, relay launcher) or Plan C (extension restructure — setup.ts SW migration, vault.ts split, StateHost typing, SW router dedup). The CLI P3 nits (let _ = entry pattern, Lock subcommand visibility, Display for ItemType, helpers::relicario_dir adoption sweep, gitea Client per-call construction, edit_and_history.rs scripted prompts, dead test variable, three-test-env-var macro, cmd_recovery_qr_unwrap empty input check, Task 12 cleanup). Server findings (P2/P3 in DEV-B's relicario-server section). WASM findings beyond the parser exports needed for P1.10 (DEV-B's WASM P2 list — double-lookup, Vec clone, naming, concurrency primitive split). The 8 "Open architectural decisions". The WASM JS-naming snake_case → camelCase decision (deferred to a separate plan). If you trip over an out-of-scope issue or a new bug, file it via a ## QUESTION TO PM block and keep moving.
Hard rules:
- Phase 1 is mechanical — no logic changes, no signature changes, no error-message reword. Run
cargo check -p relicario-clibetween every file extraction; existing CLI integration tests atcrates/relicario-cli/tests/*must stay green throughout. They are the regression budget. - Phase 2's
git_runswitches from.status()(inherited stderr to TTY) to.output()(captured); the captured stderr MUST be printed to the user's stderr unmodified on failure. Do not silently swallow. - Phase 5's
ParamsFilemigration is on-disk-format-sensitive. Field names and types MUST match the existingparams.jsonshape exactly; the round-trip test against a fixture string is required by the plan's Done criteria. - Phase 7 —
MonthYear::newcurrently returnsResult<_, &'static str>(DEV-A's P3 nit). The plan recommends re-wrapping the error inMonthYear::parserather than migratingnewtoRelicarioError. If you'd rather migratenewfor consistency, escalate to PM first — this is a cross-plan coordination concern. - Phase 8 keeps snake_case JS names (consistent with every existing export). Do not introduce camelCase for the three new exports. The snake_case → camelCase decision is deferred to a separate plan.
- Phase 8 updates
extension/src/wasm.d.tsand the new#[wasm_bindgen]exports in the same commit. Per DEV-C's boundary note,wasm.d.tsis hand-maintained — do not let the two surfaces drift even temporarily. - The Steam alphabet at
crates/relicario-core/src/item_types/totp.rs:13is intentionally non-RFC-4648 and must NOT move into the newpub(crate) mod base32. Add a neighbour comment per the plan. - Do not merge your branch to main. The PM owns merges.
- Do not push
--forceor rungit reset --hard. PerCLAUDE.md: ask first.
Coordination protocol
You are one of multiple terminals. The relay routes messages between them.
At every phase boundary (complete, blocked, or question): call read_messages(for="dev-b") first, then post your update via post_message(from="dev-b", to="pm", kind="status"|"question", body="...") and also print it here. Use this format:
## STATUS UPDATE — DEV-B
Time: <iso8601 like 2026-05-04T14:30:00-07:00>
Branch: feature/2026-05-04-b-cli-restructure
Task: <phase number / short name>
Status: STARTED | IN-PROGRESS | DONE | BLOCKED | REVIEW-READY
Last commit: <short sha + first line of message>
Tests: <green | red (which failed) | N/A>
Notes: <anything PM needs to know — keep to 3 sentences max>
When you need PM input mid-task: post via post_message(kind="question") with format:
## QUESTION TO PM — DEV-B
Time: <iso8601>
Context: <what phase, what decision point>
Options: <A: ... / B: ... / C: ...>
Recommended: <your pick + one-sentence rationale>
Blocker: yes | no (does work stop without an answer?)
You'll receive: ## DIRECTIVE TO DEV-B blocks from the PM via relay (or relayed by user if relay is down). Acknowledge and act.
Cross-plan coordination
- Plan C consumes your Phase 8 WASM exports (
parse_month_year/base32_decode_lenient/guess_mime) — but only as a deferred follow-up, NOT in Plan C's current execution. You ship the seam; Plan C does not wire the SW handlers in this train. Sequence Phase 8 to land before Plan C toucheswasm.d.tsif both must touch it. extension/src/wasm.d.tsshared touchpoint with Plan C. Plan C says it likely does NOT need to touch this file (itscreate_vault/attach_vaulthandlers reuse already-declared WASM entries). If Plan C does end up touching it, sequence Plan B's edits first and ask Plan C to rebase.- Plan A's
impl Drop for SessionHandleis independent of you. Yourgit_runand parser-migration work doesn't touch the WASM crate's session module. No conflict.
Authority within the plan
You don't need PM permission to:
- Execute phase-to-phase per the plan
- Make implementation decisions consistent with the plan and synthesis
- Add new tests, refactor your own code, fix bugs you introduce
- Choose between optional approaches the plan calls out (e.g. whether
Vault::after_manifest_changecallssave_manifestinternally vs renaming the existing method tosave_manifest_raw) - Push commits to your feature branch
You do escalate to PM when:
- You discover the grep at the top of Phase 7 returns non-CLI consumers of
parse_month_year/base32_decode_lenient/guess_mime/base32_encode/decode_base32_totp(the plan was drafted assuming zero non-CLI consumers; investigate) - A
cargo test --workspacefailure you can't reproduce locally - You want to deviate on the
MonthYear::newconsistency point (see Hard Rules) - You discover the
ParamsFileround-trip is not field-compatible with the current on-disk format (rename, type change, etc.) - A test you can't make green after honest debugging (don't fudge — debug)
- A discovered bug not in your plan
- Anything destructive (per project rules)
- Before opening the PR for review
Final steps before REVIEW-READY
Run the project's full validation:
# From the worktree root (/home/alee/Sources/relicario-plan-b):
cargo test --workspace
cargo clippy --workspace --all-targets --no-deps
cargo build -p relicario-wasm --target wasm32-unknown-unknown
# Done-criteria sanity greps (all should return zero matches):
grep -n 'bail!("git ' crates/relicario-cli/src/
grep -n 'refresh_groups_cache' crates/relicario-cli/src/ | grep -v 'session\.rs'
# These should each return one match:
grep -n 'struct ParamsFile' crates/relicario-cli/src/
# CLI smoke (post-split, end-to-end):
cargo run -p relicario-cli -- --help
Then push and open the PR:
git push -u origin feature/2026-05-04-b-cli-restructure
gh pr create --base main --head feature/2026-05-04-b-cli-restructure --title "refactor(cli): split main.rs + git_run helper + parsers→core (Plan B)" --body "$(cat <<'EOF'
## Summary
Architecture-review followup Plan B (CLI restructure — single biggest readability lift). Source: `docs/superpowers/specs/2026-05-04-cli-restructure-design.md`.
- **P1.2** — `cli/main.rs` split from 2641 LOC into `commands/{add,get,list,edit,trash,backup,import,attach,settings,sync,status,device,recovery_qr,init,generate,rate}.rs` + `prompt.rs` + `parse.rs`. `main.rs` retains clap + dispatch only (~470 lines).
- **P1.3** — `helpers::git_run(repo, args, context)` captures stderr; 16 duplicated bail sites collapsed.
- **P1.10** — `parse_month_year` / `base32_decode_lenient` / `guess_mime` migrated to `relicario-core` (`MonthYear::parse`, `pub(crate) mod base32::{encode_rfc4648,decode_rfc4648_lenient}`, `mime::guess_for_extension`); also closes DEV-A's three-base32-impls finding by extracting the shared module. WASM exports added; `extension/src/wasm.d.ts` mirrored.
- **CLI P2 cluster** — `prompt_or_flag<T>` compression of `build_*_item`; `Vault::after_manifest_change` centralizes the `refresh_groups_cache` discipline (7 sites collapsed); single canonical `ParamsFile` shared between init writer and unlock reader; batched purge — a 50-item `trash empty` is now 3 git invocations instead of 150.
## Test plan
- [ ] `cargo test --workspace` passes
- [ ] `cargo clippy --workspace` silent
- [ ] `cargo build -p relicario-wasm --target wasm32-unknown-unknown` clean
- [ ] `grep -n 'bail!("git ' crates/relicario-cli/src/` returns zero matches
- [ ] `grep -n 'refresh_groups_cache' crates/relicario-cli/src/` returns zero matches outside `session.rs`
- [ ] `grep -n 'struct ParamsFile' crates/relicario-cli/src/` returns one match
- [ ] New test asserts a multi-item `trash empty` produces exactly one new git commit
- [ ] All existing CLI integration tests at `crates/relicario-cli/tests/*` still pass without modification
## Done criteria
Per `docs/superpowers/specs/2026-05-04-cli-restructure-design.md` Done criteria — every checkbox.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
EOF
)"
Emit a ## STATUS UPDATE with Status: REVIEW-READY and the PR URL (post via post_message).
First action
After reading: emit a ## STATUS UPDATE confirming setup complete (worktree created at /home/alee/Sources/relicario-plan-b, plan absorbed, on feature/2026-05-04-b-cli-restructure). Post it via post_message(from="dev-b", to="pm", kind="status", body="..."). Then start Phase 1 of your plan (mechanical split of cli/main.rs). Remember: phase 1 is mechanical — cargo check between every file extraction.