Three commits landed since the prior sync (72a59c6) that should be reflected here: -cccb7d7rule #4 + doc-structure plan ticks -39ae629vault lock-screen logo - (this commit) Moves the doc-structure redesign from "in progress" to "complete" (Task 5 verified clean), drops the lock-screen logo from in-flight, and trims Up next to the four genuinely-outstanding items: tag cut, CLI restructure, extension restructure, security polish. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
44 lines
3.0 KiB
Markdown
44 lines
3.0 KiB
Markdown
# Relicario Roadmap
|
||
|
||
> Living document — update alongside `STATUS.md` when milestones shift.
|
||
> "Up next" items have specs; "Medium-term" items may have specs; "Long-term" items are direction, not committed scope.
|
||
|
||
## Shipped
|
||
|
||
| Version | Highlights |
|
||
|---|---|
|
||
| v0.5.x train *(on main, untagged — tag pending)* | Security audit fixes; device authentication; backup/restore + LastPass import; fullscreen UX Phases 1+2A+2B; v0.5.1 Streams A/B/C (3-column vault layout + bottom-sheet picker + toast system; left-nav settings; Recovery QR end-to-end + setup wizard Style C); 1C-γ (attachments + Document type + device registration + trash + field history); Plan B multi-stream refactor (commands/ split, prompt_or_flag, core/WASM seam); vault-tab management surfaces revamp (settings synced/local split, devices fingerprint, trash purge countdown, field-history polish, item-history-index, `#history/<id>` routing); doc-structure redesign (rename to DESIGN/CRYPTO/docs/FORMATS, scope headers + Next: footers) |
|
||
| v0.2.0 | Last tagged release — typed-item rewrite (Plans 1A/1B/1C-α/β₁/β₂) |
|
||
|
||
See `CHANGELOG.md` for tagged-release detail and `STATUS.md` for the per-train commit list.
|
||
|
||
## Up next
|
||
|
||
- **Cut a tag for the v0.5.x train** — version was bumped to 0.5.0 on 2026-05-04 but never tagged; scope now exceeds the original v0.5.0 plan. `v0.5.1` or `v0.6.0` depending on how you read the breadth. Tag-cut needs a `CHANGELOG.md` entry covering Phase 2B + v0.5.1 Streams A/B/C + 1C-γ + Plan B refactor + management-surfaces revamp + doc-structure redesign.
|
||
|
||
## Medium-term
|
||
|
||
Specced; no plan yet:
|
||
|
||
- **CLI restructure** — subcommand reorganization, interactive TUI mode
|
||
Spec: `docs/superpowers/specs/2026-05-04-cli-restructure-design.md`
|
||
- **Extension restructure** — bundle / message-routing cleanup
|
||
Spec: `docs/superpowers/specs/2026-05-04-extension-restructure-design.md`
|
||
- **Security polish** — follow-up hardening from the architecture review
|
||
Spec: `docs/superpowers/specs/2026-05-04-security-polish-design.md`
|
||
- **Phase 4: command palette** — ⌘K global search + action dispatch across the vault tab (no spec yet)
|
||
|
||
## Long-term / backlog
|
||
|
||
- **Relay server** — encrypted WebSocket relay for multi-device sync without a shared git server
|
||
Spec: `docs/superpowers/specs/2026-05-02-relay-server-design.md`
|
||
Plan: `docs/superpowers/plans/2026-05-02-relay-server.md` (`c0921b1`)
|
||
Code skeleton: `crates/relicario-server/` exists but only houses the pre-receive hook today; the relay binary would either extend or replace it.
|
||
- **Mobile** — Rust core compiles to ARM; JNI wrapper for Android, Swift wrapper for iOS
|
||
|
||
## Non-goals (explicitly deferred or cancelled)
|
||
|
||
- **Reference-image rotation** — changing the image factor without re-embedding. Back-burner, not cancelled.
|
||
- **Per-entry subkeys** — no real-world benefit at family-vault scale; see design rationale in `docs/CRYPTO.md`.
|
||
- **libgit2 / gitoxide** — shell-out to `git` is intentional; see `crates/relicario-cli/ARCHITECTURE.md`.
|